首页 | 本学科首页   官方微博 | 高级检索  
     

百色水利枢纽导流洞施工测量控制网的建立
引用本文:李艺军 叶达忠. 百色水利枢纽导流洞施工测量控制网的建立[J]. 广西水利水电, 1998, 0(3): 38-40
作者姓名:李艺军 叶达忠
作者单位:广西水利电力勘测设计研究院
摘    要:根据有关规范的要求,估算平面和竖向的精度,着重进行零阶段优化设计,选择合理的平面系统,确定施测方案,建立了符合要求的百色水利枢纽导流洞测量控制网,最后给出几种贯通测量方案供参考。

关 键 词:百色水利枢纽  导流洞  测量控制网  贯通  投影  系统  零阶段设计

Erection of the construction surveying control network of the BWRPP diverion tunnel
Li Yijun,Ye Dazhong Guangxi WREP SDR institute,Nanning. Erection of the construction surveying control network of the BWRPP diverion tunnel[J]. Gx Water Resources & Hydropower Engineering, 1998, 0(3): 38-40
Authors:Li Yijun  Ye Dazhong Guangxi WREP SDR institute  Nanning
Affiliation:Li Yijun,Ye Dazhong Guangxi WREP SDR institute,Nanning,530023
Abstract:According to the relevant codes' requiring, the authors estimated the plane and vertical precision. He stressed to make the zero stage optimal design,selected reasonal plane system,determined construction surveying plan,built up the surveying control network of the BWRPP diversion tunnel,and gave out several thorough surveying plans to consult.
Keywords:the BWRPP    diversion tunnel   surveying control network  thorough   projection   system   zero stage design  
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号