首页 | 本学科首页   官方微博 | 高级检索  
     

百色水利枢纽地下厂房防渗排水系统设计
引用本文:余青梅.百色水利枢纽地下厂房防渗排水系统设计[J].广西水利水电,1998(4):11-13,17.
作者姓名:余青梅
作者单位:广西水利电力勘测设计研究院
摘    要:介绍百色水利枢纽地下厂房防渗排水系统设计。根据地下厂房系统的布置特点及水文地质条件地下厂房采用以“厂外堵排为主,厂内排水为辅”的防渗排水措施,经三向电阻网络渗流模型试验验让,该方案是可行的。

关 键 词:地下厂房  防渗排水系统  水利枢纽  水电站

Design of seepage prevention and drainage system of the un derground power house of the Baise WR pivotal project
Yu Qingmei Guangxi WREP survey,design and research institute,Nanning.Design of seepage prevention and drainage system of the un derground power house of the Baise WR pivotal project[J].Gx Water Resources & Hydropower Engineering,1998(4):11-13,17.
Authors:Yu Qingmei Guangxi WREP survey  design and research institute  Nanning
Affiliation:Yu Qingmei Guangxi WREP survey,design and research institute,Nanning,530023
Abstract:The author introduced the design of seepage prevention and drainage system of the underground power house of the Baise WRPP .According to hydrogeologic condition and layout feature of the underground power house, he recommended the seepage prevention and drainage countermeasure of that give priority to blocking and drain outside power house,and give secondary to draining inside it.Through test of three dimensional resistivity network seepage flow model,this scheme is feasible.
Keywords:underground power house  seepage prevention and drainage system  the Baise WRPP  
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号