首页 | 本学科首页   官方微博 | 高级检索  
     

乌兹别克斯坦深井超深井钻完井技术
引用本文:冯国良,解忠义,齐奉忠,靳久强. 乌兹别克斯坦深井超深井钻完井技术[J]. 石油钻采工艺, 2012, 34(3): 16-19
作者姓名:冯国良  解忠义  齐奉忠  靳久强
作者单位:1.中国石油勘探开发研究院, 北京 100083
基金项目:中国石油天然气集团公司项目“海外油气勘探及综合配套技术研究”子课题“乌兹别克斯坦费尔甘纳盆地深井超深井钻井技术攻关及现场试验”(编号:2008E-1607)的部分内容
摘    要:为探索费尔甘纳盆地中央隆起带的含油气特征,针对该地区油气储层埋藏深(6 000~6 800 m)、井底温度高、压力高、酸性气体含量高、含盐量高等地质条件给钻井、固井和井控安全带来的系列问题,结合该地区以往钻井中无一钻达目的层工程报废遇到的困难,开展了钻井提速综合配套技术、复杂地层钻井液技术、深井超深井固井技术、“四高一超”井井身结构优化、井控技术等专题研究及现场应用,攻破了高温(140 ℃)、高压(144 MPa)、高密度钻井液(2.42 g/cm3)条件下的钻进、测井、下套管及固井等技术难题,成功地钻成了吉达3井、吉达4井2口井,其中吉达4井完钻井深6 596 m。形成了系列的钻完井配套技术,为以后费尔甘纳盆地深井超深井安全顺利钻进提供了工程技术保障。

关 键 词:深井超深井   高压   高温   钻井   固井   钻井液
收稿时间:2019-05-18

Drilling and completion techniques for deep or ultra deep wells in Uzbekistan
FENG Guoliang,XIE Zhongyi,QI Fengzhong,JIN Jiuqiang. Drilling and completion techniques for deep or ultra deep wells in Uzbekistan[J]. Oil Drilling & Production Technology, 2012, 34(3): 16-19
Authors:FENG Guoliang  XIE Zhongyi  QI Fengzhong  JIN Jiuqiang
Affiliation:1.Research Institute of Petroleum Exploration and Development, PetroChina, Beijing 100083, China2.China National Oil and Gas Exploration and Development Corporation, Beijing 100034, China3.CNPC International Uzbekistan CO., LTD, Tashigan 100084, China4.CNPC Research Institute of Drilling Engineering Technology, Beijing 100195, China
Abstract:In order to explore the oil and gas resource at the prospects of central uplift zone in Ferghana basin which is with ultra deep burial depth(6 000-6 800 m), high bottom-hole temperature, high pressure, high acidic gas content and high salinity, which poses a big challenge to drilling and cementing, and well control safety, and considering the fact that drilling works there before almost did not succeed to reach the target formation at all, The monographic study and field application were carried out on speeded drilling integrated technology, drilling fluid technology in complex stratum, well cementing technology in deep or ultra deep reservoirs, well schematic optimization of “four high and one ultra” wells and well control technology in the year of 2008 and 2009. With the technology, several drilling and completion technical problems in Fergana had been solved, mainly including penetrating, wire line logging, running casing and cementing in the conditions of high temperature(140 ℃), high pressure(144 MPa) and high density mud(2.42 g/cm3). The integrated technology was applied in well Jida 3 and Jida 4 drilling, and the well of Jida 4 had been smoothly drilled to the depth of 6 596 m. The advanced drilling and completion integrated technology will support drilling deep and ultra deep well safe at Fergana basin in the future.
Keywords:
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《石油钻采工艺》浏览原始摘要信息
点击此处可从《石油钻采工艺》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号