首页 | 本学科首页   官方微博 | 高级检索  
     

房柱式采空区上部煤层上行开采可行性分析
引用本文:刘增平.房柱式采空区上部煤层上行开采可行性分析[J].煤矿开采,2012,17(2):38-40.
作者姓名:刘增平
作者单位:陕北矿业韩家湾煤炭有限公司,陕西榆林,719315
摘    要:韩桥湾煤矿二盘区下部2-2煤层厚度大,开采条件优越,先行采用房柱式开采完毕,使其上部1-2煤层不能按正常顺序开采。根据两煤层赋存条件(煤层厚度、层间距、层间岩性等),采用垮落开采的比值法、"三带"判别法、围岩平衡法以及上、下煤层开采的时间间隔,分析论证了1-2煤层上行开采的可行性,确认二盘区上行开采1-2煤层技术上是可行的,由此可解放上方呆滞煤量,延长矿井寿命,提高经济效益,具有重要现实意义。

关 键 词:房柱式  采空区  上行开采  比值判别法  “三带”判别法  围岩平衡判别法

Feasibility of Coal Mining over Gob Room-and-pillar Mining
LIU Zeng-ping.Feasibility of Coal Mining over Gob Room-and-pillar Mining[J].Coal Mining Technology,2012,17(2):38-40.
Authors:LIU Zeng-ping
Affiliation:LIU Zeng-ping(Hanjiawan Coal Co.,Ltd,Shan′bei Mining Group,Yulin 719315,China)
Abstract:2-2 coal-seam of 2nd panel in Hanjiawan Colliery is thick and was mined by room-and-pillar mining method,so 1-2 coal-seam could not be mined with normal sequence.Feasibility of upward mining 1-2 coal-seam was made by ratio method of caving roof method,"3-zone"discriminance,surrounding rock equilibrium method and time interval of mining upper and lower seam.Result showed that upward mining 1-2 coal-seam is feasible.It had important realistic meaning for mining coal,prolonging mine life and improving economic profit.
Keywords:room-and-pillar  gob  upper mining  ratio judging method  "3-zone"discriminance  surrounding rock stability discriminance
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号