首页 | 本学科首页   官方微博 | 高级检索  
     


Vacuum Insulation and Achievement of 980 keV, 185 A/m~2 H-Ion Beam Acceleration at JAEA for the ITER Neutral Beam Injector
Authors:Hiroyuki TOBARI  Masaki TANIGUCHI  Mieko KASHIWAGI  Masayuki DAIRAKU  Naotaka UMEDA  Haruhiko YAMANAKA  Kazuki TSUCHIDA  Jumpei TAKEMOTO  Kazuhiro WATANABE  Takashi INOUE and Keishi SAKAMOTO
Affiliation:Hiroyuki TOBARI, Masaki TANIGUCHI, Mieko KASHIWAGI, Masayuki DAIRAKU, Naotaka UMEDA, Haruhiko YAMANAKA, Kazuki TSUCHIDA, Jumpei TAKEMOTO, Kazuhiro WATANABE, Takashi INOUE and Keishi SAKAMOTO Japan Atomic Energy Agency (JAEA), Mukouyama 801-1, Naka, Ibaraki 311-1093, Japan
Abstract:Vacuum insulation of -1 MV is a common issue for the HV bushing and the accel- erator for the ITER neutral beam injector (NBI). The HV bushing as an insulating feedthrough has a five-stage structure and each stage consists of double-layered insulators. To sustain ¡1 MV in vacuum, reduction of electric field at several triple points existing around the double-layered insulators is a critical issue. To reduce electric field simultaneously at these points, three types of stress ring have been developed. In a voltage holding test of a full-scale mockup equipped with these stress rings, 120% of rated voltage was sustained and the voltage holding capability required in ITER was verified. In the MeV accelerator, whose target is the acceleration of a H¡ ion beam of 1 MeV, 200 A/m2, the gap between the grid support was extended to suppress breakdowns triggered by electric field concentration at the edge and corner of the grid support. This modi fication improved the voltage holding capability in vacuum, and the MeV accelerator succeeded in sustaining ¡1 MV stably. Furthermore, it appeared that the H-ions beam was deflected and a part of the beam was intercepted at the acceleration grid. This causes high heat load on the grids and breakdowns during beam acceleration. To suppress the direct interception, a new grid was designed with proper aperture displacement based on a three dimensional beam trajectory analysis. As a result, 980 keV, 185 A/m2 H- ion beam acceleration has been demonstrated, which is close to the ITER requirement.
Keywords:neutral beam injector (NBI)  negative ion beam  HV bushing  vacuum insu- lation  
本文献已被 CNKI 等数据库收录!
点击此处可从《等离子体科学和技术》浏览原始摘要信息
点击此处可从《等离子体科学和技术》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号