一起10 kV系统故障的分析处理
引用本文:王成建. 一起10 kV系统故障的分析处理[J]. 四川水力发电, 2007, 26(3): 46-46,53
作者姓名:王成建
作者单位:华电四川宝珠寺水力发电厂,四川,广元628003
摘    要:中性点不接地系统常会遇到一些电压输出不平衡的情况。若对这方面认识不足,一方面会因电压不平衡而误认为接地情况,找不到真正的问题所在,将做许多无用功;另一方面,也可能会因未能及时找到接地点及故障原因,而给设备安全稳定运行埋下隐患或引起扩大事故。结合我厂10kV系统一次单相接地故障的处理经过,就此问题进行一些分析探讨。

关 键 词:中性点不接地系统  单相接地  现象分析  宝珠寺电厂
文章编号:1001-2184(2007)03-0046-01
修稿时间:2007-04-20

Analysis and Treatment of 10 kV System Fault
WANG Cheng-jian. Analysis and Treatment of 10 kV System Fault[J]. Sichuan Water Power, 2007, 26(3): 46-46,53
Authors:WANG Cheng-jian
Abstract:Unbalanced voltage output always occurs in ungrounded system.In one hand,unbalanced voltage is sometimes mistaken for grounding problems and so much works are done in vain.In other hand,safe and stable operation of equipment is not ensured because of potential danger or induced serious accident due to grounding point and fault cause are not found in time.Therefore,this issue is studied and discussed in this paper in relation to treatment for primary single-phase earthing fault in 10 kV system in our plant.
Keywords:neutral point ungrounded system  single-phase earthing  phenomenon analysis