首页 | 本学科首页   官方微博 | 高级检索  
     


Identifying the time of step change in binary profiles
Authors:Alireza Sharafi  Majid Aminnayeri  Amirhossein Amiri
Affiliation:1. Department of Industrial Engineering, Amirkabir University of Technology, Tehran, Iran
2. Department of Industrial Engineering, Faculty of Engineering, Shahed University, Tehran, Iran
Abstract:Control charts are intended to aid quality practitioners in monitoring whether a change has occurred in a process. When a control chart indicates an out-of-control signal, it means that the process has changed. However, control chart signals do not indicate the real time of process changes; so estimators are applied to indicate the time when a change in the process takes place, which is referred to as the change point. This paper provides a maximum likelihood estimator to identify the real time of a step change in phase II monitoring of binary profiles, in which the quality of a process is characterized by a logistic regression between the response and predictor variables. Simulation studies are provided to evaluate the effectiveness of the change point estimator.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号