首页 | 本学科首页   官方微博 | 高级检索  
     

基于BIM与Revit的地下建筑火灾预警及疏散系统
引用本文:张怡. 基于BIM与Revit的地下建筑火灾预警及疏散系统[J]. 消防科学与技术, 2020, 39(4): 491-495
作者姓名:张怡
作者单位:(成都理工大学工程技术学院,四川 乐山 614000)
基金项目:四川省教育厅科技项目“深部煤层瓦斯赋存多物理场耦合模型的建立与应用”(17ZB0062);乐山市科技局项目“矿山安全生产关键技术—乐山矿区极薄复杂结构煤层瓦斯地质规律研究”(19SZD106)
摘    要:为预防地铁等地下建筑火灾事故,将BIM与Revit技术应用于地下建筑火灾预警和疏散管理中,分析不同条件下烟雾、人员疏散过程变化,实现对地铁火灾的预警和疏散可视化平台建设。以某运营地铁站为例,根据火灾烟气扩散过程确定烟气高度作为评价疏散安全性的指标,获得临界烟气最小高度下的可用疏散时间;通过人员量化处理进行人员疏散模拟,获得必需疏散时间并与可用疏散时间对比,进行建筑模型的评价和优化,以满足安全使用要求。结果表明:现有疏散通道布局存在一定安全隐患,可通过撤除不合理商业箱、提高候车公共区空地面积、增加喷淋设备密度、组织安全疏散演练等方式降低疏散时间,降低安全隐患。

关 键 词:地下建筑  火灾预警  疏散通道  BIM  
收稿时间:2019-11-16

Fire early warning and evacuation system ofunderground building based on BIM and Revit
ZHANG Yi. Fire early warning and evacuation system ofunderground building based on BIM and Revit[J]. Fire Science and Technology, 2020, 39(4): 491-495
Authors:ZHANG Yi
Affiliation:(The Engineering & Technical College of Chengdu University of Technology, Sichuan Leshan 614000, China)
Abstract:In order to prevent underground building fire accidents such as subway, BIM and Revit technology were applied to fire early warning and evacuation management of underground buildings, and the changes of smoke and evacuation process under different conditions were analyzed, so as to realize the early warning of subway fire and the construction of visual platform for evacuation. Taking an operating subway as an example, according to the fire smoke diffusion process, the important factors of personal safety caused by smoke height were determined, which was used as the index to evaluate the safe evacuation, and the available evacuation time at the minimum critical smoke height was obtained. The evacuation simulation was carried out by quantitative processing, and the actual evacuation time was compared with the available evacuation time. In order to meet the requirements of safe use, the evaluation and optimization of building model were carried out. The results showed that there are some hidden dangers in the layout of the existing evacuation passages. The evacuation time and potential safety hazards could be reduced by evacuating the unreasonable commercial box, increasing the open space area of the waiting public area, strengthening the density of sprinkler equipment, organizing the safety evacuation exercise and so on.
Keywords:underground architecture  fire warning  evacuation channel  BIM  
本文献已被 CNKI 等数据库收录!
点击此处可从《消防科学与技术》浏览原始摘要信息
点击此处可从《消防科学与技术》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号