镇城底矿28100工作面缩面快速回撤技术研究
作者姓名:李迎喜
作者单位:山西焦煤集团西山煤电镇城底矿
摘    要:镇城底矿28100工作面是综采放顶煤工作面,因留设煤柱影响,在工作面推采过程中面临一次缩面回撤工作。针对缩面回撤过程中所面临的多个技术难点,经过反复探讨和推敲,确定了一套完备的回撤方案,对回撤期间的顶板支护、回撤流程进行设计并实施,回撤液压支架39台以及刮板输送机件,回撤并重新安装运输巷内的转载机和皮带输送机,整个回撤过程安全顺利完成,实现了既定的目标。

关 键 词:工作面缩面  快速回撤  回撤方案  顶板控制

Research on Rapid Withdrawal Technology of Contracted Face in 28100 Working Face of Zhenchengdi Coal Mine
Authors:LI Yingxi
Affiliation:(Zhenchengdi Coal Mine,Xishan Coal Electricity Group Co.,Ltd.,Shanxi Coking Coal Group,Gujiao 030203,Shanxi,China)
Abstract:The 28100 working face of Zhenchengdi Coal Mine is a fully mechanized top coal caving working face.Because of the influence of coal pillars,it is faced with a contracted face and withdrawal of the working face in the process of pushing mining.In view of several technical difficulties in the process of contracting face and withdrawal,a complete withdrawal scheme was determined after repeated discussion and deliberation.The roof support and withdrawal process during the withdrawal were designed and implemented.39 hydraulic supports and scraper conveyor parts were withdrawn,and the transfer machine and belt conveyor in the transportation lane were reinstalled.The whole withdrawal process was completed safely and smoothly,and the established goal was achieved.
Keywords:contracted face in the working face  rapid withdrawal  withdrawal scheme  roof control