深井厚冲积层软岩马头门稳定性控制技术研究
引用本文:乔卫国,吕言新,林登阁,杨麟,韦九洲,王立华. 深井厚冲积层软岩马头门稳定性控制技术研究[J]. 煤炭科学技术, 2012, 40(3): 24-27,125
作者姓名:乔卫国  吕言新  林登阁  杨麟  韦九洲  王立华
作者单位:山东科技大学土木建筑学院,山东青岛266590/山东省土木工程防灾减灾重点实验室,山东青岛266590
基金项目:教育部新世纪优秀人才支持计划资助项目(NCET-07-0519);长江学者和创新团队发展计划资助项目(IRT0843)
摘    要:基于深井厚冲积层软岩巷道稳定性较差,遇水风化软化严重,易发生塑性变形和流变的现象,针对处于高应力区、岩层节理裂隙发育的赵楼矿,为了保证处于不稳定冲积层软岩中马头门的稳定,提出了高强让压锚杆+锚索+锚注+喷射混凝土和浇灌钢筋混凝土联合支护加固。马头门施工后矿压监测锚杆和锚索受力最大值为56和108kN,具有足够的安全余量;混凝土最大应变变化值为31×10^-6,基本稳定处于安全状态,显著地改善了围岩的受力状态,提高了支护结构的承载能力,控制了围岩的变形,有效解决了深井厚冲积层马头门的稳定性控制问题,保证了巷道围岩和支护结构的共同稳定。

关 键 词:马头门稳定性  深井  软岩巷道  围岩

Study on Stability Control Technology of Ingate in Thick Alluvium Soft Rock of Deep Mine Shaft
QIAO Wei-guo,Lü Yan-xin,LIN Deng-ge,YANG Lin,WEI Jiu-zhou,WANG Li-hua. Study on Stability Control Technology of Ingate in Thick Alluvium Soft Rock of Deep Mine Shaft[J]. Coal Science and Technology, 2012, 40(3): 24-27,125
Authors:QIAO Wei-guo  Lü Yan-xin  LIN Deng-ge  YANG Lin  WEI Jiu-zhou  WANG Li-hua
Affiliation:1,2(1.School of Civil and Architecture,Shandong University of Science and Technology,Qingdao 266590,China; 2.Shandong Provincial Key Lab of Civil Engineering Disaster Prevention and Control,Qingdao 266590,China)
Abstract:Due to the deep mine poor stability of the soft rock roadway in a thick alluvium,serious weathered and weaken when met with water,easy occurred plastic deformation and rheology phenomenon,according to Zhaolou Mine in a high stress area and with the joint and crack developed rock strata,in order to ensure the stability of the ingate in the unstable Alluvium soft rock,a combined support system with high strength yielding bolt+anchor+bolt grouting+shotcreting and site pouring reinforced concrete was provided for the reinforcement of the ingate.After the reinforcement of the ingate conducted,the max stressed value of the bolt and anchor measured would be 56 kN and 108 kN individually and would have a sufficient safety margins.The max strain varied value of the concrete would be 31×10-6,would be in a safety status basically,would remarkably improve the stressed status of the surrounding rock,could improve the bearing capacity of the support structure and could control the deformation of the surrounding rock.Thus the stability control problem of the ingate in thick Alluvium of the deep mine could be effectively solved.The stability of the roadway surrounding rock and the support structure could be ensured.
Keywords:ingate stability  deep mine shaft  soft rock gateway  surrounding rock