首页 | 本学科首页   官方微博 | 高级检索  
     

“二牵六”大截面导线架线施工技术
引用本文:侯建明.“二牵六”大截面导线架线施工技术[J].电力建设,2010,31(8):43-45.
作者姓名:侯建明
作者单位:(吉林省送变电工程公司,长春市,130022)
摘    要:提出了“二牵六”大截面导线架线施工技术,并在向家坝-上海±800 kV特高压直流输电线路工程皖3A标段成功应用,解决了900 mm2、1 000 mm2大截面多分裂导线的架线施工难题。

关 键 词:±  800  kV  特高压直流  架线施工技术  二牵六  大截面导线  组合走板  无线监控  

Installation and Wire Stringing Technology for 2-Pulling-6 Large-sectional Conductors
HOU Jian-ming.Installation and Wire Stringing Technology for 2-Pulling-6 Large-sectional Conductors[J].Electric Power Construction,2010,31(8):43-45.
Authors:HOU Jian-ming
Affiliation:HOU Jian-ming(Jilin Provicial Power Transmission & Substation Project Co.,Changchun 130022,China)
Abstract:A two-drag-six stringing construction technology for large cross-section conductors was developed and successfully applied in the Anhui 3A section of Xiangjiaba-Shanghai ± 800 kV UHVDC project,which has solved the problem of stringing multi-bundle large cross-section conductors of 900 mm^2 and 1 000 mm^2.
Keywords:± 800 kV UHVDC project  stringing construction technology  two-drag-six  large-sectiond conductors  assembly working boowd  wireless supewisory
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《电力建设》浏览原始摘要信息
点击此处可从《电力建设》下载全文