首页 | 本学科首页   官方微博 | 高级检索  
     

输出短路故障下的DAB暂态过流分析
引用本文:陈杨帆,张宇. 输出短路故障下的DAB暂态过流分析[J]. 中国电机工程学报, 2021, 0(2): 667-680
作者姓名:陈杨帆  张宇
作者单位:华中科技大学电气与电子工程学院;强电磁工程与新技术国家重点实验室(华中科技大学)
基金项目:国家重点研发计划项目(2018YFB0904700);国家自然科学基金项目(51977092);武汉市黄鹤英才(专项)计划项目。
摘    要:文章详细分析运行在双重移相下的双有源桥在输出短路故障下的暂态过程。分析过程采用时域分析法,并实现内部及外部电路的解耦。针对不同的模态,推导双有源桥在不同类型短路故障后,内部电流、输出电压和输出电流的暂态表达式,进而论证暂态过程中存在的过流现象,指出最严重的过流风险。基于暂态过程的分析结果,该文提出在输出端串联电感来实现双有源桥的短路故障穿越的方法,并推导了串联电感值的范围,使双有源桥在内部电路无过流风险的前提下,提供合适的短路故障特征。基于MATLAB/Simulink软件对50k W的双有源桥模型进行仿真,同时搭建500W的实验样机并完成实验验证。仿真及实验结果验证所提分析结果及方法的正确性。

关 键 词:双有源桥  负荷短路  暂态过程  过流

Transient Overcurrent Analysis of Dual Active Bridges Under Short Circuits of Loads
CHEN Yangfan,ZHANG Yu. Transient Overcurrent Analysis of Dual Active Bridges Under Short Circuits of Loads[J]. Proceedings of the CSEE, 2021, 0(2): 667-680
Authors:CHEN Yangfan  ZHANG Yu
Affiliation:(School of Electrical and Electronic Engineering,Huazhong University of Science and Technology,Wuhan 430074,Hubei Province,China;State Key Laboratory of Advanced Electromagnetic Engineering and Technology(Huazhong University of Science and Technology),Wuhan 430074,Hubei Province,China)
Abstract:In this paper, the transient process of DAB under output short-circuit fault was analyzed in detail. Firstly, as the transient process analysis of the internal circuit was the main content, the time domain method and the decoupling method were used to derive the expression of the transient value of the internal current under different short-circuit situations;meanwhile, the transient expressions of output voltage and output current had been derived. The worst-case overcurrent conditions after short-circuit fault was obtained and the devices that are exposed to the greatest risk of overcurrent had been found. Based on the analysis results of the transient process, this paper proposed a method that adding a series inductor at the output to achieve fault ride-through;the range of the inductance to provide fault current feature while ensuring the safety of the internal circuit is derived. Based on MATLAB/Simulink, a 50 k W DAB was simulated, and a 500 W experimental prototype is built to complete the experimental verification. Simulation and experimental results verifies the correctness of the analysis results and the proposed method.
Keywords:dual active bridge(DAB)  short-circuit of load  transient process  overcurrent
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号