首页 | 本学科首页   官方微博 | 高级检索  
     

糯扎渡水电站高压配电装置选型及开关站站址选择
引用本文:邵光明. 糯扎渡水电站高压配电装置选型及开关站站址选择[J]. 水力发电, 2005, 31(5): 77-79
作者姓名:邵光明
作者单位:中国水电顾问集团昆明勘测设计研究院,云南,昆明,650051
摘    要:糯扎渡水电站地形狭窄,主厂房布置在左岸地下.500kV开关站布置困难,根据枢纽布置,采用不同的设备型式和布置方案.进行技术、经济比较,选定500kV开关站布置方案为:高压配电装置采用SR全封闭组合电器,开关站站址采用地面GIS方案。

关 键 词:开关站  高压配电装置  GIS  选型  糯扎渡水电站
文章编号:0559-9342(2005)05-0077-03

The type selection for HV distribution equipment and site selection for switchyard
Shao Guang-ming. The type selection for HV distribution equipment and site selection for switchyard[J]. Water Power, 2005, 31(5): 77-79
Authors:Shao Guang-ming
Abstract:The Nuozhadu hydropower plant is located at the narrow terrain areas, the main powerhouse is arranged at the left bank underground, and it's hard to choose the place to arrange 500 kV switchyard. According to the pivot layout, different equipment type and arrangement scheme shall be selected to compare the economy and technique of the hydropower plant, after that, 500 kV switchyard layout will be determined, that is, the HV distribution equipment adopt SF6 fully closed device and the switchyard adopts the GIS ground Scheme.
Keywords:switchyard   HV distribution equipments  GIS  selection  Nuozhadu Hydropower Station
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号