对太钢尖山铁矿如期投产条件浅析
引用本文:郝士杰.对太钢尖山铁矿如期投产条件浅析[J].中国矿业,1994(Z1).
作者姓名:郝士杰
作者单位:太钢尖山铁矿建设指挥部
摘    要:尖山铁矿自1991年开工建设以来,采选系统现已负荷联动试车。本文结合建设及试车过程中出现的问题,分析了投产的有利和不利条件,并提出相应的措施和借鉴意见.

关 键 词:如期  投产  条件  措施

BRIEF ANALYSIS OF CONDITIONS PUTTMG INTO PRODUCTION ON TIME OF JIANSHAN IRON MINE
Hao Shijie.BRIEF ANALYSIS OF CONDITIONS PUTTMG INTO PRODUCTION ON TIME OF JIANSHAN IRON MINE[J].China Mining Magazine,1994(Z1).
Authors:Hao Shijie
Abstract:Since the construction of Jianshan Iron Mine started in 1991, the test running of mining-concentration system had been carried out. Combined with problems appeared during the constuction, this paper analyses favourable and unfavourable conditions to put into production, and presents the appropriate measures and the suggestions for reference.
Keywords:Iron mine  Construction  Put into production  Conditions  Measures