三峡ALSTOM水轮机导水机构结构设计与安装
引用本文:陈雄藻. 三峡ALSTOM水轮机导水机构结构设计与安装[J]. 中国三峡建设, 2003, 0(9): 9-11
作者姓名:陈雄藻
作者单位:葛洲坝集团机电建设公司 湖北宜昌
摘    要:三峡水电站左岸电厂装有14台700MW混流式水轮机组,由两个集团供货,ALSTOM供货8台,VGS供货6台。合同规定两个供货商的机组结构不求一致,对ALSTOM提供的水轮机导水机构的结构设计及其安装特点作一论述。对同类机组会有一定的借鉴作用

关 键 词:水轮机 导水机构 结构设计 安装 ALSTOM 三峡水电站
文章编号:1006-6349(2003)09-0009-03

Structural design and erection of gate mechanism delivered by ALSTOM
CHEN Xiong-zao. Structural design and erection of gate mechanism delivered by ALSTOM[J]. China Three Gorges Construction, 2003, 0(9): 9-11
Authors:CHEN Xiong-zao
Abstract:The differences in unit structures are allowed in contractual documents between the eight and six 700 MW mixed-flow turbines delivered by the ALSTOM and the VGS respectively for the left powerhouse at the Three Gorges project. The features of the structural design and installation of the gate mechanism for the turbines are described in this paper, which will be helpful for other similar units.
Keywords:700 WM turbine  gate mechanism  structural design  installation characteristics  Three Gorges.