首页 | 本学科首页   官方微博 | 高级检索  
     


How to analyse and maximise the forest fuel supply availability to power plants in Eastern Finland
Authors:Tapio Ranta  Olli-Jussi Korpinen
Affiliation:Lappeenranta University of Technology, Department of Energy and Environmental Technology, Jääkärinkatu 3E, FI-50101 Mikkeli, Finland
Abstract:The annual use of forest fuels has grown rapidly in Finland during the 21st century. In 2007 the annual use was 5.3 TWh (firewood use excluded), whereas the targeted growth by the year 2010 is 10.6 TWh, i.e. some 5 million m3. The purpose of this work was to evaluate the maximum availability of forest fuels to CHP plants in Eastern Finland. The total availability to the selected CHP plant population was 7 TWh at the maximum transport distance of 100 km. The main share came from logging residues, 3.3 TWh, and the rest from stumps, 1.8 TWh, and small diameter energy wood, 1.9 TWh. The highest plant-specific availability reached the level of 1.7-1.8 TWh, but the overlapping procurement areas reduced the availability for most plants to a level less than 1 TWh. In all plant sites peat fuel could be partially compensated with forest fuels according to availability, but not completely due to the boiler technology. Increasing the targeted national forest fuel use presupposes the use of new logistics supply solutions, such as other transport modes and regional buffer storage networks. This makes it possible to widen the traditional procurement area-based on truck transportation, which is less than 60 km because of a dense plant network.
Keywords:Biomass resources   Combined heat and power generation (CHP)   Geographical information systems (GIS)   Biomass availability   Biomass allocation
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号