首页 | 本学科首页   官方微博 | 高级检索  
     


Optimization of HPS 70W Applications
Authors:Edward P Wasserman
Affiliation:Civil Engineering Director, Structures Div., Tennessee Dept. of Transportation, S. 1100, James K. Polk Building, Nashville, TN?37243-0339.
Abstract:In February 1996 the Tennessee Department of Transportation, in cooperation with the Federal Highway Administration, the American Iron and Steel Institute, the U.S. Navy, and various steel plate manufacturers, agreed to design the first bridge in the United States to use HPS 485W (70W) steel. Since that time the department has constructed a second bridge using HPS 485W (70W) and has let to contract a third bridge that uses HPS 485W (70W) in both quenched and tempered and thermomechanical controlled processing HPS 485W (70W) steel. This paper will discuss lessons learned in the process and present optimization techniques employed.
Keywords:High-strength steel  Optimization  Bridges  steel  
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号