An agent-based collaborative assembly process planning system |
| |
Authors: | Sang Hoon Kong Sang Do Noh Young-Geun Han Gibom Kim Kyo Il Lee |
| |
Affiliation: | (1) School of Mechanical and Aerospace Engineering, Seoul National University, San 56-1, Shinlim-dong, Kwanak-ku, Seoul, 151-742, South Korea;(2) School of Systems Management Engineering, Sungkyunkwan University, 300, Chunchun-dong, Jangan-gu, Suwon, Kyunggi-do, 440-746, South Korea;(3) Division of Industrial Systems Engineering, Myong Ji University, Namdong, Yongin, Kyunggi-do, 449-728, South Korea;(4) Department of Manufacturing Automation, Seoul National University of Technology, 172, Gongneung-dong, Nowon-ku, Seoul, 139-743, South Korea;(5) School of Mechanical and Aerospace Engineering, Seoul National University, San 56-1, Shinlim-dong, Kwanak-ku, Seoul, 151-742, South Korea |
| |
Abstract: | In recent years, the competition among manufacturers to reduce the development time of new products has been quite fierce. At the same time, customers’ needs have become relatively diverse. Considering these facts, it is essential for manufacturers to build an assembly line in the shortest time possible. Because an assembly line for varied and complex products involves numerous workstations, assembly operations and resources, it is extremely difficult for assembly process planners to develop an efficient assembly sequence and position. Thus, in order to overcome such complications, the best alternative is for a number of process planners to develop a process plan synchronously . This paper introduces a new process planning method for assembly lines based on a collaborative system. In it we propose an agent-based collaborative process planning system, and to verify it, we implement the system in an Internet environment and apply it to some practical case studies. |
| |
Keywords: | Agent Assembly process planning Bound operation method Collaborative process planning Complication and mediation |
本文献已被 SpringerLink 等数据库收录! |
|