Second law analysis of wind turbine power plants: Cesme, Izmir example
Authors:Omer Baskut   Onder Ozgener  Leyla Ozgener
Affiliation:a Graduate School of Natural and Applied Sciences, Solar Energy Science Branch, Ege University, TR-35100, Bornova, Izmir, Turkey;b Solar Energy Institute, Ege University, TR-35100, Bornova, Izmir, Turkey;c Department of Mechanical Engineering, Faculty of Engineering, Celal Bayar University, TR-45140, Muradiye, Manisa, Turkey
Abstract:In this study, the energy and exergy efficiency results of the Wind Turbine Power Plants (WTPPs) are presented. Exergy, energy and technical availability analysis are performed. The case study includes the actual system data taken from the system in Cesme, Izmir WTPP. General energy, exergy and other performance parameters are also presented. Investigated WTPP is Turkey’s first installed (1998) wind plant (1.50 MW) located in Izmir. Exergy efficiency of the power plant found to be between 0% and 68.20%. The monthly average technical availabilities are 96.11%, 98.71%, 98.52% for turbine 1, turbine 2, and turbine 3, respectively. Furthermore, authors developed some correlations, which are capable of predicting the values of exergy efficiencies of the WTPP for different power factor value.
Keywords:Exergy   Wind   Renewable energy
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号