首页 | 本学科首页   官方微博 | 高级检索  
     

青藏铁路格拉段铺设桥上无缝线路关键问题研究
引用本文:韩峰,王保成. 青藏铁路格拉段铺设桥上无缝线路关键问题研究[J]. 中国建材科技, 2013, 0(2): 91-92
作者姓名:韩峰  王保成
作者单位:兰州交通大学土木工程学院,甘肃 兰州730070
摘    要:结合青藏铁路格拉段桥上无缝线路设计问题,探讨了高寒、大温差地区铺设桥上无缝线路的关键问题.从提高线路允许温升、增大允许温降等方面入手,对合理确定锁定轨温及其容许范围进行了深入探讨,提出一些扩大桥上无缝线路铺设范围的具体保障措施。

关 键 词:桥上无缝线路  允许温升  允许温降  锁定轨温

Study of the key issues of laying CWR on bridge of Qinghai-tibet railway
Abstract:Considering the problems of continuous welded rail (CWIK) design on the bridge in Geermu-Lasa section of the Qinghai-Tibet Railway,the article discussed the key issues of laying CW1K in the cold and large temperature difference region. Beginning from improving the line allowed temperature rise and increasing the line allowed temperature drop,it discussed how to reasonably determine the locked rail temperature and its allowable range,put forward some concrete safeguards to expand the range of laying CWR on bridge.
Keywords:continuous welded rail (CWR) on the bridge  allowed temperature rise  allowed temperature drop  locked rail temperature
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号