首页 | 本学科首页   官方微博 | 高级检索  
     


Organization of the fast data acquisition and synchronization in the ITER plant control system
Authors:S. S. Portone  N. L. Marusov  E. Yu. Mironova  E. S. Rogova  I. B. Semenov
Affiliation:1.Private Enterprise ITER Design Center,State Corporation of Atomic Energy,Moscow,Russia
Abstract:Main components of the control data acquisition and communication (CODAC) system for process technologies of the ITER plant are described. The CODAC system demonstrates the state-of-the-art level of high-performance measuring and control systems. The solution to designing stationary ultrahigh-speed measuring channels (quantization frequency is ≥1 GHz) is proposed in the ITER project. The organization of synchronizing the measuring channel synchronization system with the universal time is considered in the ITER project.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号