首页 | 本学科首页   官方微博 | 高级检索  
     

紧凑型输电线路带电作业方式及安全防护
引用本文:胡毅,王力农,邵瑰玮,刘凯,刘庭,胡建勋.紧凑型输电线路带电作业方式及安全防护[J].电网技术,2007,31(23):6-10.
作者姓名:胡毅  王力农  邵瑰玮  刘凯  刘庭  胡建勋
作者单位:国网武汉高压研究院,湖北省,武汉市,430074;国网武汉高压研究院,湖北省,武汉市,430074;国网武汉高压研究院,湖北省,武汉市,430074;国网武汉高压研究院,湖北省,武汉市,430074;国网武汉高压研究院,湖北省,武汉市,430074;国网武汉高压研究院,湖北省,武汉市,430074
摘    要:由于紧凑型线路塔头尺寸紧凑,相间和相对地距离较小,对带电作业间距、组合间隙及作业人员进出高电位路径带来了较大的限制。为确保带电作业人员的安全,对影响紧凑型线路带电作业安全间距的诸因素进行了分析讨论,通过试验提出了针对不同过电压水平的紧凑型线路带电作业安全距离、绝缘工具最小有效长度和最小组合间隙;分析了保护间隙的原理及设计原则,提出了500 kV紧凑型线路加装保护间隙的作业方式及安全措施,并通过试验得出了相关技术参数。结合现场实际,提出对于进出等电位的带电作业,过电压幅值大于1.80 pu且作业人员从塔身进出等电位时,应采用加装保护间隙的作业方式。

关 键 词:紧凑型输电线路  带电作业  保护间隙  安全距离  组合间隙  高电压技术
文章编号:1000-3673(2007)23-0006-05
收稿时间:2007-09-01
修稿时间:2007年9月1日

Live Working Ways for Compact Transmission Lines and Relevant Safety Protection
HU Yi,WANG Li-nong,SHAO Gui-wei,LIU Kai,LIU Ting,HU Jian-xun.Live Working Ways for Compact Transmission Lines and Relevant Safety Protection[J].Power System Technology,2007,31(23):6-10.
Authors:HU Yi  WANG Li-nong  SHAO Gui-wei  LIU Kai  LIU Ting  HU Jian-xun
Affiliation:Wuhan High Voltage Research Institute of SGCC,Wuhan 430074,Hubei Province,Chin
Abstract:As for the compact transmission lines,the compact size of tower head,the smaller phase-to-phase distance and phase-to-earth distance bring a variety of limits to live working spacings,complex gaps and the paths via which the operating personnel enters and leaves the high potential region.To ensure the safety of live working operating personnel,the factors impacting the safe spacing of live working on compact transmission lines are analyzed and by means of tests the safe distances of live working on compact transmission line under different over-voltage levels,the minimum usable length of insulating tools and the minimum complex gaps are proposed;the principle of portable protective gap(PPG) and its design principle are analyzed,the working ways as well as the safety manners for adding PPG to 500kV compact transmission line are put forward,and the relevant parameters are obtained by tests.Combining with on-site condition,when operating personnel enters or leaves the high potential region,it is proposed to adopt the working way of adding PPG to compact lines while the over-voltage amplitude is higher than 1.80 per unit and the operating personnel enters or leaves the high potential region via the tower body.
Keywords:compact transmission lines  live working  portable protective gap  safe distance  complex gaps  high voltage engineering
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《电网技术》浏览原始摘要信息
点击此处可从《电网技术》下载全文