首页 | 本学科首页   官方微博 | 高级检索  
     

MODEL STUDY ON PREVENTING SEDIMENT DEPOSSITION IN WATER INTAKE SYSTEM
引用本文:Wang Xing-kui,Yang Mei-qingDept. of Hydraulic Engineering,Tsinghua University,Beijing 100084,P. R. China. MODEL STUDY ON PREVENTING SEDIMENT DEPOSSITION IN WATER INTAKE SYSTEM[J]. 水动力学研究与进展(B辑), 1997, 0(4)
作者姓名:Wang Xing-kui  Yang Mei-qingDept. of Hydraulic Engineering  Tsinghua University  Beijing 100084  P. R. China
作者单位:Wang Xing-kui,Yang Mei-qingDept. of Hydraulic Engineering,Tsinghua University,Beijing 100084,P. R. China
摘    要:The hydraulic and sediment deposition problems in the water intake system of a pumping house were studied by physical model.The experimental results of different working cases indicate that the sediment depositions at the gates,stilling basin and culverts are very few when the system was normally operated,but in the forebay of pumping house,especially in the pumping house for living water,the amount of sediment deposition sometimes is considerably large.At the front of the entry of pumping house forliving water,installing a set of oblique pipes can prevent the coarse grains to enter it,the deposition amount will obviously decrease.


MODEL STUDY ON PREVENTING SEDIMENT DEPOSSITION IN WATER INTAKE SYSTEM
Wang Xing-kui,Yang Mei-qingDept. of Hydraulic Engineering,Tsinghua University,Beijing ,P. R. China. MODEL STUDY ON PREVENTING SEDIMENT DEPOSSITION IN WATER INTAKE SYSTEM[J]. Journal of Hydrodynamics, 1997, 0(4)
Authors:Wang Xing-kui  Yang Mei-qingDept. of Hydraulic Engineering  Tsinghua University  Beijing   P. R. China
Affiliation:Wang Xing-kui,Yang Mei-qingDept. of Hydraulic Engineering,Tsinghua University,Beijing 100084,P. R. China
Abstract:The hydraulic and sediment deposition problems in the water intake system of a pumping house were studied by physical model. The experimental results of different working cases indicate that the sediment depositions at the gates, stilling basin and culverts are very few when the system was normally operated, but in the forebay of pumping house, especially in the pumping house for living water, the amount of sediment deposition sometimes is considerably large. At the front of the entry of pumping house for living water, installing a set of oblique pipes can prevent the coarse grains to enter it, the deposition amount will obviously decrease.
Keywords:model study   intake water   sediment deposition
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号