限额设计在EPC项目中的应用研究
引用本文:耿德全.限额设计在EPC项目中的应用研究[J].有色金属设计,2009,36(2):59-63.
作者姓名:耿德全
作者单位:中色科技股份有限公司,河南,洛阳,471039
摘    要:对于采用固定总价合同的EPC项目而言,工程承包企业在项目管理中推行限额设计,对于控制投资,实现合同目标,确保利润显得非常有意义。本文提出了EPC项目开展限额设计的组织模式和工作流程,并对开展限额设计应注意问题和限额设计的基础工作进行了论述。

关 键 词:限额设计  EPC项目  应用研究

Study on Application of Rationed Design in EPC Project
GENG De-quan.Study on Application of Rationed Design in EPC Project[J].Nonferrous Metals Design,2009,36(2):59-63.
Authors:GENG De-quan
Affiliation:GENG De-quan ( China Nonferrous Metals Processing Technology Co. , Ltd. , Luoyang 471039, China)
Abstract:As to EPC project adopting fixed total price contract, it is significant that rationed design was carried out in Contractor' s project management for controlling investment, realizing contract' s targets and ensuring profits. The organization model and working flow of rationed design carried out in EPC project were put forward and its matters needing attention and fundamental work in rationed design were also discussed.
Keywords:Rationed design  EPC project  application research