首页 | 本学科首页   官方微博 | 高级检索  
     

杆塔整体起吊两点吊最佳方案设计
引用本文:甘凤林,赵岩松,孔伟. 杆塔整体起吊两点吊最佳方案设计[J]. 东北电力学院学报, 1996, 0(1)
作者姓名:甘凤林  赵岩松  孔伟
作者单位:东北电力学院建筑工程系
摘    要:根据输电线路中杆塔施工的实际工程需要,建立了杆塔整体起吊的数学模型,编制了抱杆参数优化和杆塔整体起吊最佳方案设计的软件,解决了杆塔施工中的难题。

关 键 词:抱杆参数,最佳吊点,整体起吊

Design of Best Scheme of Two-point Lifting Method in Pole Tower Integral Hoisting
Gan Fenglin, Zhao Yansong, Kong Wei. Design of Best Scheme of Two-point Lifting Method in Pole Tower Integral Hoisting[J]. Journal of Northeast China Institute of Electric Power Engineering, 1996, 0(1)
Authors:Gan Fenglin   Zhao Yansong   Kong Wei
Abstract:To fulfil field demand of pole tower erection,the mathematical model for pole tower integral hoisting is established. software of gin pole parameters optimization and design of best scheme of pole tower integral hoisting is programmed to solve difficult problems encountered in pole tower erection.
Keywords:gin pole parameter   best liftpoint   integral hoisting  
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号