首页 | 本学科首页   官方微博 | 高级检索  
     

引子渡水电站溢洪道设计与试验研究
引用本文:姚元成,杨金涛. 引子渡水电站溢洪道设计与试验研究[J]. 大坝与安全, 2004, 0(2): 23-25
作者姓名:姚元成  杨金涛
作者单位:国家电力公司贵阳勘测设计研究院,贵阳,550002;国家电力公司贵阳勘测设计研究院,贵阳,550002
摘    要:综合考虑枢纽布置,通过理论设计与试验研究结合,调整溢洪道布置,使其满足施工及运行要求。

关 键 词:引子渡水电站  溢洪道  设计布置  试验研究  优化调整
文章编号:1671-1092(2004)02-0023-03
修稿时间:2004-03-03

On spillway designing and experiment study of Yinzidu hydropower station
by YAO Yuan-cheng and YANG Jin-taoGuiyang Hydroelectric Investigation Design and Research Institute. On spillway designing and experiment study of Yinzidu hydropower station[J]. Large Dam & Safety, 2004, 0(2): 23-25
Authors:by YAO Yuan-cheng and YANG Jin-taoGuiyang Hydroelectric Investigation Design and Research Institute
Affiliation:by YAO Yuan-cheng and YANG Jin-taoGuiyang Hydroelectric Investigation Design and Research Institute
Abstract:To comprehensive consider the layout of the whole hydraulic structure,design of spillway layout is adjusted to meet the requirement of construction and operation through theory design and experimental study.
Keywords:Yinzidu hydropower station  spillway  design layout  experiment and study  optimizing and adjusting
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号