首页 | 本学科首页   官方微博 | 高级检索  
     


Capacitated lot-sizing and scheduling with sequence-dependent,period-overlapping and non-triangular setups
Authors:António Aroso Menezes  Alistair Clark  Bernardo Almada-Lobo
Affiliation:1.Faculdade de Engenharia,da Universidade do Porto,Porto,Portugal;2.Bristol Institute of Technology,University of the West of England,Bristol,UK
Abstract:In production planning, sequence dependent setup times and costs are often incurred for switchovers from one product to another. When setup times and costs do not respect the triangular inequality, a situation may occur where the optimal solution includes more than one batch of the same product in a single period—in other words, at least one sub tour exists in the production sequence of that period. By allowing setup crossovers, flexibility is increased and better solutions can be found. In tight capacity conditions, or whenever setup times are significant, setup crossovers are needed to assure feasibility. We present the first linear mixed-integer programming extension for the capacitated lot-sizing and scheduling problem incorporating all the necessary features of sequence sub tours and setup crossovers. This formulation is more efficient than other well known lot-sizing and scheduling models.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号