首页 | 本学科首页   官方微博 | 高级检索  
     


Statistical testing for sufficient control chart performances during monitoring of grouped processes
Authors:Kevin Nikolai Kostyszyn  Tobias Claus Brandstätter  Thomas Vollmer  Robert Schmitt
Affiliation:Department for Production Quality, Fraunhofer Institute for Production Technology IPT, Aachen, Germany
Abstract:With ISO 7870-8, a standardized application of charting techniques for short runs and small mixed batches was presented in 2017. Similar to various scientific approaches, it requires that sample values from grouped processes follow nearly identical distributions. In practice, however, there tend to be differences between distribution parameters. Moreover, equal parameters do not ensure that distributions are properly aligned to the center line and control limits of the chart. These facts can lead to undesired control chart performances which can be expressed by average run lengths (ARL) during in-control and out-of-control conditions. In this work, a statistical test for sufficient control chart performances during monitoring of grouped processes based on preliminary samples is proposed. Control chart performances are defined as sufficient when they deviate within acceptable ranges from usual performances during single process monitoring in mass production. The ARL resulting from estimated distributions and planned production sequences is used as test statistic and calculated via the Markov chain approach. Exemplary tests are executed for scenarios with individuals and cumulated sum (CUSUM) charts. A simulative determination of error rates resulting from the ARL-based testing demonstrates its effectiveness in testing for sufficient control chart performances compared to an indirect testing with Levene's test and a one-way analysis of variance (ANOVA).
Keywords:average run length  control chart performances  grouped processes monitoring  ISO 7870-8  short run SPC
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号