首页 | 本学科首页   官方微博 | 高级检索  
     

考虑源网荷储协调的主动配电网优化调度方法研究
引用本文:罗金满,刘丽媛,刘 飘,叶睿菁,覃 朋.考虑源网荷储协调的主动配电网优化调度方法研究[J].电力系统保护与控制,2022,50(1):167-173.
作者姓名:罗金满  刘丽媛  刘 飘  叶睿菁  覃 朋
作者单位:广东电网有限责任公司东莞供电局信息中心,广东东莞 523000;南方电网深圳数字电网研究院有限公司,广东深圳 518053
基金项目:南方电网公司科技项目资助(031900HK42200008)
摘    要:针对源网荷储的一体化运行目标,提出一种考虑源网荷储的主动配电网协调运行调度方法.基于多时间尺度的思想,以最小化可调节量和最大程度地增加新能源消纳为目标,建立一个具有两个互补时间尺度的主动配电网日前-日内优化调度模型,将差分进化算法和帝国竞争算法相结合求解最优调度模型.仿真验证了所提出的多源协同调度方法的优越性.仿真结果...

关 键 词:主动配电网  源网荷储  优化调度模型  帝国竞争算法  微分进化算法
收稿时间:2021/3/31 0:00:00
修稿时间:2021/5/26 0:00:00

An optimal scheduling method for active distribution network considering source network load storage coordination
LUO Jinman,LIU Liyuan,LIU Piao,YE Ruijing,QIN Peng.An optimal scheduling method for active distribution network considering source network load storage coordination[J].Power System Protection and Control,2022,50(1):167-173.
Authors:LUO Jinman  LIU Liyuan  LIU Piao  YE Ruijing  QIN Peng
Affiliation:1. Dongguan Power Supply Bureau Information Center, Guangdong Power Grid Corporation, Dongguan 523000, China; 2. Southern Power Grid Shenzhen Digital Grid Research Institute Co., Ltd., Shenzhen 518053, China
Abstract:Aiming at the integrated operational goal of source network load and storage, an active distribution network coordinated operation scheduling method considering source network load and storage is proposed. Based on the idea of multiple timescales, a day ahead day optimal dispatch model of an active distribution network with two complementary timescales is established with the objective of minimizing the adjustable quantity and maximizing the new energy consumption. A differential evolution algorithm and empire competition algorithm are combined to solve the optimal scheduling model. Simulation verifies the superiority of the proposed method. The simulation results show that this method can effectively reduce the load fluctuation and operational cost, increase the new energy consumption rate by 9.1%, and has clear practicality. This work is supported by the Science and Technology Project of China Southern Power Grid Co., Ltd. (No. 031900HK42200008).
Keywords:active distribution network  source network load storage  optimal scheduling model  imperial competitive algorithm  differential evolution algorithm
本文献已被 万方数据 等数据库收录!
点击此处可从《电力系统保护与控制》浏览原始摘要信息
点击此处可从《电力系统保护与控制》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号