首页 | 本学科首页   官方微博 | 高级检索  
     

小浪底水利枢纽灌溉塔引水条件分析
引用本文:安催花 林秀芝. 小浪底水利枢纽灌溉塔引水条件分析[J]. 人民黄河, 1999, 21(6): 36-38
作者姓名:安催花 林秀芝
作者单位:黄河水利委员会勘测规划设计研究院,黄河水利委员会引黄灌溉局
摘    要:小浪底水利枢纽灌溉塔是黄河北岸灌区引水的关键。根据枢纽泄水建筑物布置及调度方式和不库设计采用的运用方式,分析了灌溉塔前的水位变化,泥沙淤积、等引水条件,认为不同的泄水建筑物正常开启条件下灌溉塔不会被泥沙淤堵,塔前含沙量一般可满足引水要求,但运用中要注意排污清污。

关 键 词:灌溉塔 引水条件 小浪底水利枢站 泄水洞

Analysis of Water Diversion Conditions of the Irrigation Tower in Xiaolangdi Hydraulic Key Project in the Yellow River
An Cuihua,Zeng Qin. Analysis of Water Diversion Conditions of the Irrigation Tower in Xiaolangdi Hydraulic Key Project in the Yellow River[J]. Yellow River, 1999, 21(6): 36-38
Authors:An Cuihua  Zeng Qin
Abstract:The irrigation tower of Xiaolangdi hydraulic key project is crucial to the north irrigation areas of the Yellow River. Conditions of drawing water from the Yellow River, such as water level change in front of the tower, sedimentation, features of pollution material, sediment concentration and so on, are analyzed in the paper according to the distribution of water relief structures and their dispatching ways as well as the possible operation models of the reservoir. It is realized that the irrigation tower will not be blocked by sediment under normal operation of the water relief structures and the sediment concentration in front of the tower can meet the irrigation requirements, but some attention should be paid on pollution clearance in operation. If the operation model of lifting step by step is applied in Xiaolangdi reservoir, the water level in the first 6 years during reservoir operation will not match the demand for water drawing.
Keywords:water drawing conditions   irrigation tower   Xiaolangdi hydraulic key project
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号