代建制与总承包的理论差异分析研究
引用本文:林基础,李柯,吴俊贺. 代建制与总承包的理论差异分析研究[J]. 建筑经济, 2007, 0(6)
作者姓名:林基础  李柯  吴俊贺
作者单位:东南大学土木工程学院项目管理研究所 江苏南京210096(林基础,吴俊贺),河南省黄河水利职业技术学院 河南开封475003(李柯)
摘    要:代建制与总承包模式中都存在大量的项目管理工作,因此有一定的类似.本文从诸方面分析了两者之间的关键区别,从概念上对二者进行甄别,为两种模式共存的工程的责权分析与界面管理提供了依据.

关 键 词:代建制  总承包  比较分析

Research on Theoretical Difference of Agent-construction System and General Contract
LIN Jichu,LI Ke,WU Junhe. Research on Theoretical Difference of Agent-construction System and General Contract[J]. Construction Economy, 2007, 0(6)
Authors:LIN Jichu  LI Ke  WU Junhe
Abstract:There has been substantive project management work in agent-construction system and general contract mode,and as a result there is some similarity between agent-construction system and general contract mode. In this paper,the key differentiation between them should be analyzed from all sides in order to make concept distinction,and the result supply the gist for duty-power analysis and interface management of the project owns the two modes.
Keywords:agent-construction system  general contract  comparative analysis