首页 | 本学科首页   官方微博 | 高级检索  
     

落地镗床PLC控制系统研究与改造
引用本文:俞鸿斌.落地镗床PLC控制系统研究与改造[J].煤矿机械,2007,28(8):163-165.
作者姓名:俞鸿斌
作者单位:金华职业技术学院,机电工程学院,浙江,金华,321017
摘    要:介绍了运用FX2N-80MR PLC对落地镗床进行数控化改造设计的原理,采用PLC技术控制全数字直流调速器实现机床的无级调速,设计外部接口电路及PLC程序编制。实践证明改造好的落地镗床大大提高了原系统的可靠性,大大提高了机床性能和加工能力,从而保证了产品的质量。

关 键 词:落地镗床  PLC  改造
文章编号:1003-0794(2007)08-0163-03
修稿时间:2007-05-19

Research and Reform in Ground Borer PLC Control System
YU Hong-bin.Research and Reform in Ground Borer PLC Control System[J].Coal Mine Machinery,2007,28(8):163-165.
Authors:YU Hong-bin
Abstract:Introduces the principle of the ground borer CNC reform utilizing FX2N-80MR PLC technique.The stepless speed regulating of machine was realized by the control full-number DC actiyator with PLC.Designs external circuit and controlling programe of PLC.The practice shows it improve the reliability of the system,the performance and processing capacity of the CNC ground borer are greatly enhanced.
Keywords:ground borer  PLC  reform
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号