首页 | 本学科首页   官方微博 | 高级检索  
     

彭水水电站施工总体布置设计
引用本文:朱卫军,何为,徐春子. 彭水水电站施工总体布置设计[J]. 人民长江, 2006, 37(1): 33-34
作者姓名:朱卫军  何为  徐春子
作者单位:长江水利委员会,设计院,湖北,武汉,430010;长江水利委员会,设计院,湖北,武汉,430010;长江水利委员会,设计院,湖北,武汉,430010
摘    要:彭水水电站规模较大,项目较多,施工工期紧.施工总体布置要依据控制性分年施工计划、坝区移民、征地以及国家和当地经济发展总趋势等,对有限的资源在时间、空间上进行合理、有序的组织,对大型水电工程文明施工进行新的探索.施工总体布置以右岸为主、左岸为辅,生产区与生活区相对分开,共分6区:即左岸上游关溪沟施工区,右岸替溪沟施工区,右岸鸭公溪施工区,右岸上游过坝转运区,右岸三斧沱码头区,彭水县城过坝码头区.

关 键 词:场地布置  施工道路  场地排水  彭水水电站
文章编号:1001-4179(2006)01-0045-02
收稿时间:2005-11-25
修稿时间:2005-11-25

Construction site general layout design of Pengshui hydropower station
ZHU Wei-jun,HE Wei,XU Chun-zi. Construction site general layout design of Pengshui hydropower station[J]. Yangtze River, 2006, 37(1): 33-34
Authors:ZHU Wei-jun  HE Wei  XU Chun-zi
Abstract:The construction of Pengshui hydropower station is characterized by its large scale,many construction items and urgent construction period.The construction site general layout should be designed in accordance with the annual control construction plans,the resettlement and land requisition in the dam area,the general trend of state and local economic development,etc.,with limited resources reasonably and orderly organized in time and space to further probe into the civilized construction of a large-scale hydropower project.The construction site layout of Pengshui hydropower station takes the right bank as a primary construction area and the left bank as a secondary one,with the production area relatively separated from the living area,including 6 construction zones: left bank upstream Guanxikou construction zone;right bank Tixigou construction zone;right bank Yagongxi construction zone;right bank upstream transshipment zone;right bank Sanfutou wharf zone;Pengshui county town wharf zone.
Keywords:construction site layout  construction road  drainage of construction site  Pengshui hydropower station
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《人民长江》浏览原始摘要信息
点击此处可从《人民长江》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号