首页 | 本学科首页   官方微博 | 高级检索  
     

高聚物超薄防渗墙施工设备及工艺改进
引用本文:郭成超,杨建超,石明生,蔡兵华,李忠超,关欢. 高聚物超薄防渗墙施工设备及工艺改进[J]. 水利水电科技进展, 2020, 40(3): 68-71
作者姓名:郭成超  杨建超  石明生  蔡兵华  李忠超  关欢
作者单位:中山大学土木工程学院, 广东 广州 510275;郑州大学水利科学与工程学院, 河南 郑州 450001;武陟裕泰房地产开发有限公司,河南 武陟 454950;郑州大学水利科学与工程学院, 河南 郑州 450001;武汉市市政建设集团有限公司,湖北 武汉 430023;西南交通大学土木工程学院,四川 成都 610031
基金项目:国家重点研发计划(2017YFC5002600)
摘    要:针对现行高聚物防渗墙施工中成槽能力有限、槽孔垂度不易控制、连续性和密实性较差等不足,对其设备和工艺进行改进,并对改进后设备及工艺的成墙效果进行了检验。结果表明:双轴测柱式电子水平仪的应用实现了锥头板的精准套孔;在原有的三锥头压槽板基础上,加长引导杆及变固定式锥头为一次性活动式锥头,可提高套孔速度和精度,保证搭接孔垂度及连续性;提升-注浆一体化施工工艺避免了槽孔的坍塌或收缩,保证了墙体的均匀性、连续性和密实性。改进后的高聚物防渗墙施工设备及工艺能够保证高聚物防渗墙的垂度及搭接完整性,提高设备工作效率,加快工程施工进度。

关 键 词:高聚物防渗墙  施工设备  施工工艺  压槽板

Improvement of construction equipment and technology of super-thin cut-off walls with polymer
GUO Chengchao,YANG Jianchao,SHI Mingsheng,CAI Binghu,LI Zhongchao,GUAN Huan. Improvement of construction equipment and technology of super-thin cut-off walls with polymer[J]. Advances in Science and Technology of Water Resources, 2020, 40(3): 68-71
Authors:GUO Chengchao  YANG Jianchao  SHI Mingsheng  CAI Binghu  LI Zhongchao  GUAN Huan
Affiliation:School of Civil Engineering, Sun Yat-sen University, Guangzhou 510275, China; School of Water Conservancy Engineering, Zhengzhou University, Zhengzhou 450001, China;Wuzhi Yutai Real Estate Development Co., Ltd., Wuzhi 454950, China;Wuhan Municipal Construction Group Co., Ltd., Wuhan 430023, China; School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, China
Abstract:Aiming at the shortcomings of existing cut-off walls with polymer during construction, including limited trench capacity, difficult verticality, poor continuity and compactness, the improvement for the construction equipment and technology was carried out and the effects were inspected. The results show that the application of the electronic level instrument of biaxial measuring column realizes the accurate hole sleeve of the cone head plate. Lengthening the guide rod and changing the fixed cone head into one-time movable cone head can improve the speed and accuracy of hole insertion and can ensure the verticality and continuity of the overlapping hole. The integrated construction technology of lifting and injection can avoid collapse or shrinkage of the slot hole, and the uniformity, continuity and compactness of the wall can be ensured. The improvement of the construction equipment and the technology of super-thin cut-off walls with polymer can ensure the verticality and lap integrity of the wall, improve the working efficiency of the equipment, accelerate the construction progress.
Keywords:cut-off walls with polymer   construction equipment   construction technology   grooved plate
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《水利水电科技进展》浏览原始摘要信息
点击此处可从《水利水电科技进展》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号