太平湾发电厂计算机监控系统改造
引用本文:于德明. 太平湾发电厂计算机监控系统改造[J]. 水电自动化与大坝监测, 2008, 32(5): 1-4
作者姓名:于德明
作者单位:国电东北公司太平湾发电厂,辽宁省丹东市,118000
摘    要:太平湾发电厂原实时监控系统于1998年投入运行,2007年进行改造,采用MODICON可编程逻辑控制器(PLC)作为下位机现地控制单元(LCU),HP工作站和服务器以及WONDERWAREIAS构成上位机系统,文中介绍了新系统的结构、功能及运行情况。

关 键 词:水电厂  计算机监控系统  现地控制单元  上位机
收稿时间:2008-06-28

Reform of the Computer Supervisory and Control System of Taipingwan Hydropower Plant
YU Deming. Reform of the Computer Supervisory and Control System of Taipingwan Hydropower Plant[J]. HYDROPOWER AUTOMATION AND DAM MONITORING, 2008, 32(5): 1-4
Authors:YU Deming
Abstract:The previous real-time computer supervisory and control system of the Taipingwan Hydropower Plant was put into operation in 1998.It was reformed in 2007 by adopting MODICON PLCs as LCUs,HP workstations and servers and WONDERWARE IAS as the host computer system.This paper introduces the structure,functions and operation of the reformed system.
Keywords:hydropower plant   computer supervisory and control system   LCU   host computer