首页 | 本学科首页   官方微博 | 高级检索  
     

综采工作面过空巷支护实践研究
引用本文:段春生.综采工作面过空巷支护实践研究[J].煤炭工程,2010,0(5):0-0.
作者姓名:段春生
作者单位:山西晋神能源有限公司,沙坪煤矿,山西,忻州,036500
摘    要: 以资源整合矿井---沙坪煤矿1802综采工作面过石梯子空巷为例,重点介绍了综采工作面过空巷的支护措施,分析研究了过空巷期间综采工作面矿压的变化情况,进而阐述资源整合矿井综采工作面安全顺利通过空巷的重大意义。

关 键 词:资源整合  过空巷  支护措施
收稿时间:2009-07-26;

Practices and Study on Support for Fully Mechanized Coal Mining Face Passed Through Mine Abandoned Gateway
DUAN Chun-sheng.Practices and Study on Support for Fully Mechanized Coal Mining Face Passed Through Mine Abandoned Gateway[J].Coal Engineering,2010,0(5):0-0.
Authors:DUAN Chun-sheng
Abstract:By resources conformity mine pit---Shapings the coal mine 1802 syntheses to pick the working surface stone ladder worked-out section is the example, introduced with emphasis the synthesis picked the working surface worked-out section the supports and protections measure, the analytical study worked-out section period synthesis has picked the change situation which the working surface ore pressed, then elaborated the resources conformity mine pit synthesis picked the working surface safely to pass the worked-out section smoothly the great significance.
Keywords:
本文献已被 万方数据 等数据库收录!
点击此处可从《煤炭工程》浏览原始摘要信息
点击此处可从《煤炭工程》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号