2^#1880m^3高炉铁口工作状态分析 |
| |
引用本文: | 陈怀波,鲍永良,郭东,肖颖.2^#1880m^3高炉铁口工作状态分析[J].莱钢科技,2007(6):56-57. |
| |
作者姓名: | 陈怀波 鲍永良 郭东 肖颖 |
| |
摘 要: | 高炉炉前铁口管理是多方面的综合管理,对2^#1880m^3高炉铁口出现的问题采取针对性的措施,抓住操作上的可控因素,铁口工作状况取得明显进步。
|
关 键 词: | 高炉 铁口 炮泥 措施 |
Analysis of Working State of No. 2 1880-m^3 B. F. S Tapping Hole |
| |
Authors: | Chen Huaibo Bao Yongliang Guo Dong Xiao Ying |
| |
Abstract: | The management of a B.F. tapping hole is an integrated one in many aspects. Pertinent measures were taken to Solve problems arisen in the No. 2 1880-m^3 B.F. tapping hole and controllable factors in operation were tackled, with its working state making progress evidently. |
| |
Keywords: | B F tapping hole tapping hole clay measures |