三峡ALSTOM发电机定子绕组安装
引用本文:於少良. 三峡ALSTOM发电机定子绕组安装[J]. 中国三峡建设, 2003, 10(12): 15-17
作者姓名:於少良
作者单位:葛洲坝集团机电建设有限公司 湖北宜昌443133
摘    要:三峡左岸电站共安装14台单机容量700MW立轴混流式水轮发电机组,其中8台由ALSTOM集团供货。对三峡首台ALSTOM水轮发电机组(5#机)定子绕组安装工艺作了介绍。

关 键 词:三峡电站 水轮发电机组 定子下线 混流式水轮发电机组 吸尘器 安装
文章编号:1006-6349(2003)12-0015-03
修稿时间:2003-12-09

Installation of stator windings for ALSTOM generator
YU Shao-liang. Installation of stator windings for ALSTOM generator[J]. China Three Gorges Construction, 2003, 10(12): 15-17
Authors:YU Shao-liang
Abstract:Fourteen vertical Francis turbine-generators, each with capacity of 700 MW, were installed in the left powerhouse at the Three Gorges project. The installation of stator's windings for the turbine-generators delivered by the ALSTOM consortium that provided totally 8 units is presented in this paper.
Keywords:generator  stator winding installation  stator internal water cooling.