首页 | 本学科首页   官方微博 | 高级检索  
     

三峡永久船闸无粘结预应力锚束测力计安装及监测成果分析
引用本文:陈孝英.三峡永久船闸无粘结预应力锚束测力计安装及监测成果分析[J].贵州水力发电,2001,15(3):47-51.
作者姓名:陈孝英
作者单位:中国人民武装警察部队三峡工程指挥部,
摘    要:三峡永久船闸高边坡布设预应力锚束 436 7束 ,安装预应力锚束测力计 10 1台 ,计 91束。本文介绍预应力锚束测力计的安装和监测成果 ,分析预应力锚束荷载锁定时的损失和运行的变化规律 ,对已施工锚束的锚固效果进行了评价

关 键 词:三峡永久船闸  无粘结  预应力锚束  测力计安装  监测成果  锁定荷载  荷载损失
文章编号:1007-0133(2001)03-0047-05
修稿时间:2001年4月16日

Installation of dynamometer for prestressing anchor cable without cohesion in permanent lock of Three Gorges Project & analysis on its monitoring achievements
CHEN Xiao-ying.Installation of dynamometer for prestressing anchor cable without cohesion in permanent lock of Three Gorges Project & analysis on its monitoring achievements[J].Guizhou Water Power,2001,15(3):47-51.
Authors:CHEN Xiao-ying
Abstract:In the high sides of permanent lock of Three Gorges Project, 4367 prestressing anchor cables were set up, and 101 dynamometers for 91 prestressing cables were installed. The paper has introduced installation and monitoring achievements of dynamometer for prestressing cables, and analyzed load loss when it was locked as well as stress change law when they are operated . The writer has appreciated the anchoring effect of the anchor that have been set up.
Keywords:permanent lock of Three Gorges Project  without cohesion  prestressing anchor cable  installation of dynamometer  locking load  load loss
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号