首页 | 本学科首页   官方微博 | 高级检索  
     

某大底盘超高层建筑基础设计
引用本文:王超,罗晓勇.某大底盘超高层建筑基础设计[J].工业建筑,2013,43(3):142-146.
作者姓名:王超  罗晓勇
作者单位:1. 同济大学结构工程与防灾研究所,上海200092;上海现代都市建筑设计院,上海200041
2. 湘潭市建筑设计院,湖南湘潭,411100
摘    要:某超高层建筑高243 m,主体结构采用了框架-核心筒结构体系,基础选用桩筏基础形式。该工程主楼、裙房、纯地下室地下连为一体,形成大底盘主、裙地下连体建筑基础。为有效控制差异沉降,采用了变刚度调平设计、灌注桩后注浆和设置后浇带等有效措施。在简要介绍该工程结构特点的基础上,系统地阐述该工程基于结构布置、地质情况等因素综合考虑进行的基础设计,重点介绍变刚度调平设计的方法。

关 键 词:超高层  大底盘  桩筏基础  变刚度调平设计

FOUNDATION DESIGN OF A SUPER HIGH-RISE BUILDING WITH ENLARGED BASE
Abstract:A super high-rise building was located in Jiangyin with a height of 243 m.It was adopted the frame-corewall structural system and pile raft foundation.The main building,podium and pure basement were connected together underground without any deformation joint,which leaded to an enlarged base.Therefore,optimized design of pile foundation stiffness,post grouting for cast-in-situ pile and post-pouring belt were used in the project for controlling differential settlement.The structure characteristics were briefly introduced,where the foundation design based on the structural arrangement and geological data were elaborated.An optimized design of pile foundation stiffness to reduce differential settlement was emphatically introduced.
Keywords:super high-rise building  enlarged base  pile raft foundation  optimized design of pile foundation stiffness
本文献已被 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号