高边坡预裂孔施工技术
引用本文:罗运诚,陈刚. 高边坡预裂孔施工技术[J]. 爆破, 2007, 24(1): 36-39
作者姓名:罗运诚  陈刚
作者单位:中国葛州坝集团,湖北,宜昌,443002;中国葛州坝集团,湖北,宜昌,443002
摘    要:钻孔质量是影响爆破效果的一个直接因素,预裂炮孔超过15 m后随着孔深的增大偏移也增大,从而影响预裂爆破质量,为此,在对预裂孔钻机加固安装的基础上,对直线高边坡进行分析、对弧状边坡进行直线分解,经近10万m2高边坡预裂爆破实践证明,此施工技术可行.

关 键 词:高边坡  预裂  钻孔  施工方法
文章编号:1001-487X(2007)01-0036-04
修稿时间:2006-11-03

Application of Pre-splitting Blasting to High Rock Slope
LUO Yun-cheng,CHEN Gang. Application of Pre-splitting Blasting to High Rock Slope[J]. Blasting, 2007, 24(1): 36-39
Authors:LUO Yun-cheng  CHEN Gang
Abstract:When the length of pre-splitting blasting holes surpassing 15 m,the migration of pre-splitting blasting holes increases along with the depth of the holes,and further influences the quality of the pre-splitting blasting.So we reinforce the foundation of the drilling machine.The analysis on the nearly 100 000 m2 high rock slope pre-splitting blasting practices proves that this implementation technology is feasible.
Keywords:high rock slope  pre-splitting blasting  drill  implementation method