首页 | 本学科首页   官方微博 | 高级检索  
     

纪村土坝培土加固降低浸润线的实施及效果
引用本文:汪正春.纪村土坝培土加固降低浸润线的实施及效果[J].大坝与安全,2004(3):71-72.
作者姓名:汪正春
作者单位:大唐陈村水力发电厂,安徽,泾县,242500
摘    要:纪村土坝表层土松散,降雨后浸润线明显升高。为降低降雨对浸润线的影响,采用铲去土坝表层松散土,重新培土、夯实、固结,从而减少表层雨水的浸入,保持土坝稳定、安全。

关 键 词:纪村土坝  培土加固  浸润线  干容重
文章编号:1671-1092(2004)03-0071-02
修稿时间:2004年4月2日

Performing filling soil to drop saturation line in Jicun earth dam
by WANG Zheng-chun// Chencu Hydropower Station.Performing filling soil to drop saturation line in Jicun earth dam[J].Large Dam & Safety,2004(3):71-72.
Authors:by WANG Zheng-chun// Chencu Hydropower Station
Affiliation:by WANG Zheng-chun// Chencu Hydropower Station
Abstract:The surface soil layer at Jicun earth dam became loose, it results in saturation line going up after rainfall. In order to reduce the impact of rainfall on saturation line, we carry out to remove the loose soil at dam surface and refill, tamp, consolidate the dam. It will prevent soil surface from rainfall immerging, which make soil dam safe and stable.
Keywords:Jicun earth dam  soil filling and reinforcement  saturation line  dry density
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号