桥巩水电站工程主要施工技术综述
引用本文:谢天华,韦国灵. 桥巩水电站工程主要施工技术综述[J]. 红水河, 2008, 27(6)
作者姓名:谢天华  韦国灵
作者单位:广西水电工程局,广西,南宁,530023;广西水电工程局,广西,南宁,530023
摘    要:桥巩水电站是红水河规划的第九个梯级电站,是一座典型的灯泡贯流式水电站,其单机容量57.0 MW为全国最大、世界第二大的水轮发电机组.由于电站规模大,及地质条件差,岩溶发育,在施工中遇到了许多难题,为加快施工进度,保证按期发电的目标,采取了各种先进的施工技术措施与方案.

关 键 词:施工技术  厂房  围堰  二期坝  截流  橡胶坝  桥巩水电站

Overview on Main Engineering Techniques of Qiaogong Hydropower Station
XIE Tian-hua,WEI Guo-ling. Overview on Main Engineering Techniques of Qiaogong Hydropower Station[J]. Hongshui River, 2008, 27(6)
Authors:XIE Tian-hua  WEI Guo-ling
Affiliation:XIE Tian-hua,WEI Guo-ling(Guangxi Hydroelectric Construction Bureau,Nanning 530001)
Abstract:Ranked as the 9th cascade station built on the Hongshui River,Qiaogong hydropower station is a typical bulb tubular power station with a unit capacity of 57.0MW,in which there is turbine-generator unit that is the largest in China and the second largest in the world.Construction of the station meets many difficulties due to a large scale of the station,unfavorable geologic conditions and developed karst area where the station is built.In order to accelerate construction pace and achieve power generation on ...
Keywords:engineering technique  powerhouse  cofferdam  2nd stage dam  river closure  rubber dam  Qiaogong hydropower station  