首页 | 本学科首页   官方微博 | 高级检索  
     

130t/h循环流化床锅炉的优化设计
引用本文:杜继恩. 130t/h循环流化床锅炉的优化设计[J]. 能源工程, 2009, 0(1): 59-63
作者姓名:杜继恩
作者单位:宁波热电股份有限公司,浙江,宁波,315800
摘    要:通过对前后两代130 t/h循环流化床锅炉结合生产实际的改进设计提出了参考意见,为锅炉厂实施优化设计打下了基础。优化设计后的锅炉的实际运行取得了满意的效果,为以后类似问题的解决提供了一定的参考。

关 键 词:设计  生产实际  优化设计  效果显著

Optimization design of 130 t/h CFB
DU Ji-en. Optimization design of 130 t/h CFB[J]. Energy Engineering, 2009, 0(1): 59-63
Authors:DU Ji-en
Affiliation:DU Ji-en ( Ningbo Thermal Power Co. , Ltd, Ningho 315800, China)
Abstract:Consult ideas about the improved design of two generations 130 t/h CFB combined with the actual production were proposed, which built foundation for the implementation of optimization design of boiler-making plant. After the optimized design, boiler actual production result showed that, it has obtained the satisfactory effect, which provides reference for solving the similar problem.
Keywords:design  actual production  optimization design  significant
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号