首页 | 本学科首页   官方微博 | 高级检索  
     


Project of the GT-MHR high-temperature helium reactor with gas turbine
Authors:A. I. Kiryushin   N. G. Kodochigov   N. G. Kouzavkov   N. N. Ponomarev-Stepnoi   E. S. Gloushkov  V. N. Grebennik
Abstract:In February 1995, MINATOM of Russia and General Atomics (USA) signed the Agreement for the development and design of the GT-MHR facility with a modular helium reactor and a gas turbine intended to be constructed in Russia. This Agreement was subsequently expanded by the participation of Framatom and Fuji Electric. The GT-MHR facility is designed for burning weapons-grade plutonium and utilization of the heat produced in the direct gas-turbine cycle with electricity production efficiency of about 50%. In future such facilities with uranium fuel will be proposed for use as commercial NPPs. A GT-MHR prototype and fuel production facility are intended to be constructed at the Siberian Chemical Combine in Seversk (Tomsk-7). In accordance with the Agreement, a conceptual design of the GT-MHR should be developed in September 1997. As a part of the conceptual design, a reactor module with a power conversion system is being designed and plutonium fuel is being developed.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号