首页 | 本学科首页   官方微博 | 高级检索  
     

大型桁架临时固结法吊装工法
引用本文:柳强.大型桁架临时固结法吊装工法[J].中国水能及电气化,2020(1):17-20.
作者姓名:柳强
作者单位:中铁十九局集团第五工程有限公司
摘    要:超高、超重、超长桁架吊装施工的桁架稳定性,历来受到施工单位高度重视,能否在节省费用的同时做到施工安全及线性美观,是施工企业能否做到经济、迅速、高效的关键。京能水洞沟电厂输煤系统7号栈桥工程钢桁架架空结构吊装中,采用了新的施工工法,取得了良好的效果,为相似工程的施工积累了宝贵的经验,值得在类似结构的工程施工中借鉴。

关 键 词:大型桁架  固结法  吊装工法

Hoisting Construction Method for Temporary Consolidation Method of Large Truss
LIU Qiang.Hoisting Construction Method for Temporary Consolidation Method of Large Truss[J].China Hydropower & Electrification,2020(1):17-20.
Authors:LIU Qiang
Affiliation:(China Railway 19th Bureau Group Fifth Engineering Co.,Ltd.,Dalian 116000,China)
Abstract:The stability of ultrahigh,overweight and overlength truss hoisting construction has always been highly valued by construction units.Whether the construction can be safe,linear beautiful while costs are saved is the key to economic,rapid and efficient of construction enterprises.A new construction method is adopted in the hoisting of steel truss aerial construction of No.7 trestle project of coal handing system in Jingneng Shuidonggou Power Plant,and good results are obtained by adopting a new construction method,thereby accumulating valuable experience in construction of similar projects.It is worthy of reference in engineering construction of similar projects.
Keywords:large truss  consolidation method  hoisting construction method
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号