龙滩大坝混凝土供料线及塔(顶)带机性能测试试验
引用本文:杨大勇,严君汉.龙滩大坝混凝土供料线及塔(顶)带机性能测试试验[J].水力发电,2005,31(4):62-64.
作者姓名:杨大勇  严君汉
作者单位:长江水利委员会长江勘测规划设计院,湖北,武汉,430010
摘    要:通过对龙滩水电站大坝混凝土供料线及塔(顶)带机的设备运行测试试验,找出碾压混凝土浇筑时放料、输送、仓面施工三个环节的衔接关系,以及这种新工艺运用于碾压混凝土坝浇筑的施工特点和施工方法,从而对该工艺给予一个正确评价,同时通过该试验,对设备进行性能验收。

关 键 词:供料线  塔(顶)带机  性能测试  仓面施工  碾压混凝土  龙滩水电站
文章编号:0559-9342(2005)04-0062-03

Tests on the performances of material supply line and tower belt conveyor and the construction
YANG Da-yong,Yan Jun-han.Tests on the performances of material supply line and tower belt conveyor and the construction[J].Water Power,2005,31(4):62-64.
Authors:YANG Da-yong  Yan Jun-han
Abstract:The performance tests on the material supply line and tower belt conveyor of Longtan dam were carried out to find out the relationship among the concrete pouring, transportation and construction of RCC, as well as to get the construction characteristics and methods of such new technique in the placement of RCC, in order to make a correct evaluation on such technique. At the same time, the tests also can help to conduct the performance acceptance of the equipment.
Keywords:material supply line  tower belt conveyor  performance test  concrete construction  RCC  Longtan Hydropower Station