首页 | 本学科首页   官方微博 | 高级检索  
     

塑性混凝土在围堰防渗墙中的运用
引用本文:杨忠兴. 塑性混凝土在围堰防渗墙中的运用[J]. 水力发电, 2010, 36(2)
作者姓名:杨忠兴
作者单位:中国葛洲坝集团第二工程有限公司,四川,成都,610091
摘    要:锦屏一级水电站上游土石围堰堰基采用塑性混凝土与墙下帷幕防渗,以适应松散透水地基复杂的水文地质条件和工程地质条件。该围堰塑性混凝土原材料选择、配合比设计、生产工艺、浇筑施工和质量控制等方面的经验,可供相关工程参考。经检查,该围堰塑性混凝土质量达到优秀水平。

关 键 词:围堰  防渗墙  塑性混凝土  锦屏一级水电站

Application of Plastic Concrete in the Construction of Cofferdam Cut-off Wall
Yang Zhongxing. Application of Plastic Concrete in the Construction of Cofferdam Cut-off Wall[J]. Water Power, 2010, 36(2)
Authors:Yang Zhongxing
Affiliation:Yang Zhongxing(China Gezhouba Group No.2 Engineering Co.,Ltd.,Chengdu Sichuan 610091)
Abstract:The upper earth-rock cofferdam of Jinping I Hydropower Station use plastic concrete and curtain wall for seepage control.The quality of plastic concrete construction is excellent after taking measures on raw material selection,mix design,production process,pouring and quality control.The experiences can be as references for similar construction.
Keywords:cofferdam  cut-off wall  plastic concrete  Jinping I Hydropower Station  
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号