首页 | 本学科首页   官方微博 | 高级检索  
     

斜拉桥施工控制方法及实践
引用本文:张青.斜拉桥施工控制方法及实践[J].山西建筑,2006,32(1):273-274.
作者姓名:张青
作者单位:石家庄铁道学院桥梁专业研究生,河北石家庄050043
摘    要:结合兰州小西湖黄河斜拉桥的施工控制实践,从控制论在施工中应用的角度,对目前斜拉桥的施工控制方法、现状、内容和控制系统进行了阐述,指出了目前斜拉桥施工控制系统中尚需解决的问题。

关 键 词:斜拉桥  施工控制  控制系统
收稿时间:2005-08-29

fConstruction control of cable stayed bridges
ZHANG Yu.fConstruction control of cable stayed bridges[J].Shanxi Architecture,2006,32(1):273-274.
Authors:ZHANG Yu
Abstract:Based on the construction control systems of the cable stayed bridges of Lanzhou Xiaoxihu Huanghe, from the viewpoint of use of the system control theory in construction of cable stayed bridges, introduced the methods,the situation, contents and the system of the control of the construction of cable stayed bridges of the cable stayed bridges, and presented some problems in the systems, which must be resolved in the future.
Keywords:cable stayed bridges  construction control  control system
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号