Abstract: | In the six 200MW units of Datong NO. 2 power Plant, after commission, the air hood rotary air preheaters which were previously applied in boiler suffered a large air leakage rate, which affected the safe and economic operation. Therefore, it was determined to replace them with rotor rotary air preheaters. This paper intrdouces new structures and parameters of air preheater, erection, organization, management and quality control during the retrofit of the power plant. As a result, after commission, the resistance is lowered and the actual air leakage factor is. 6.9%, reaching the level of its type and obtatining good technical and economic results. |